A-E Redesign of Deterrence Park, Offutt AFB, NE
Presolicitation notice
Project Description (RFO 5.101(c)(4)(i)): The 55th Contracting Squadron requires professional Architect-Engineer (A-E) civil, structural, and geotechnical design services to redesign Deterrence Park (Project SGBP 20-0077) at Building 1000, Offutt Air Force Base, Nebraska. The requirement includes geotechnical investigation and foundation redesign to support static display missile loads, utility and footing conflict resolution, and the delivery of finalized construction drawings, technical specifications, and cost estimates. Procedures and Timeline (RFO 5.101(c)(4)(ii)): This proposed contract
Save and track · Ask about this bid
Key dates
- Posted
- 2026-11-18
- Responses due
- Thu, Dec 03, 2026 at 09:00 PM UTC
Buyer
DEPT OF DEFENSE
FA4600 55 CONS PKP
View this buyer’s purchasing history
Solicitation A071835